Custom steel frame structure with alucobond roof material.
This sprung structure is the first insulated structure with Class O fire rated membrane on the interior. Build specifically to be used as a ballroom and function room.
Supply and install Sprung structure for Dubai racing Club in Dubai. 3 structures one 27m wide x 30m long and two 15m x 20m long structure will installed on 5m scaffolding structure using special Ibeam clamp system. Structure was tied entire steel scaffold fame weighing estimate 40tons. 5 dasy to erect and handover and tear down in 2 days.
Project manager for entire engineering and structure setup and supply install and manage one 27m wide and two 15m wide structure for launch of Meyden property owned by Dubai racing Club. Structure was installed on beach with raised platforms and anchored using counter weights.